PROJECTS | INSTITUTIONAL
The four-story, 88,313-square-foot School of Pharmacy with a four-story underground parking garage was constructed in 15 months. Construction is concrete frame structure with post tension reinforcing. The first level consists of a retail pharmacy with a two-story lobby and grand monumental stair. Lab facilities and classrooms are located on the second through fourth floors with a two-story meeting room on the fourth floor..
Architect | Earl Swensson Associates
Completion Date | August 2010
Location | Nashville, Tennessee
Building Cost | $26 Million Construction Cost
The six-story, 103,342-square-foot dormitory with 409 beds was constructed in 14 months. Construction is concrete frame structure with post tension reinforcing. Each floor consists of a suite layout with two dormitory rooms connected by a bathroom and shower. Classrooms and a laundry room are located in the basement.
Architect | Earl Swensson Associates
Completion Date | August 2010
Location | Nashville, Tennessee
Building Cost | $17 Million Construction Cost
The six-story, 67,000-square-foot dormitory with 200 beds was constructed in nine months. Construction is concrete frame structure with post tension reinforcing. Each floor consists of a suite layout with two dormitory rooms connected by a bathroom and shower. A network operations data center is located in the basement.
Architect | Earl Swensson Associates
Completion Date | August 2008
Location | Nashville, Tennessee
Building Cost | 67,000 square feet; $11.4 Million Construction Cost
This 53,000-square-foot dormitory included total renovation of the existing six-floor building. Scope included new windows, mechanical, electrical and plumbing systems. A new masonry pedestrian bridge and exterior pediment and column features were added to embellish the building exterior.
Architect | Hastings Architecture Associates
Completion Date | August 2007
Location | Nashville, Tennessee
Building Cost | $8.9 Million Construction Cost
This four-story, 71,200-square-foot School of Nursing with a 350-car underground parking garage is located on the edge of campus at Belmont University. Classrooms and teaching labs are located on floors 1 through 3 with lecture hall and boardroom on the fourth floor.
Architect | Earl Swensson Associates
Completion Date | May 2006
Location | Nashville, Tennessee
Building Cost | 71,200 square feet; $19.4 Million Construction Cost
This five-story, 334-bed dormitory with a four-story 324-car garage was constructed in 14 months. This poured-in-place concrete structure is clad with a brick Arriscraft and aluminium glass system. The entrance to the two-story lobby includes arched entry ways, a monumental staircase and tile floors.
Architect | Everton Oglesby Architects
Completion Date | August 2006
Location | Nashville, Tennessee
Building Cost | 77,841-square-foot Dormitory (334 beds); 111,992-square-foot Parking Garage (324 cars); $15.7 Million Construction Cost
Renovation of 58,000-square-foot multiplex cinema including classrooms, recording studios and offices.
Architect | Gresham Smith and Partners
Completion Date | August 2002
Location | Nashville, Tennessee
Building Cost | 58,000 square feet; $2.0 Million Construction Cost
|